CHOSUN

건설공사 공기단축 방법의 개선방안에 관한 연구-광주광역시 공동주택을 중심으로

Metadata Downloads
Author(s)
김자연
Issued Date
2007
Abstract
ABSTRACT

A Study on Improvement of Ways for Reducing Construction Duration in Building Construction
-focusing on apartments in Gwangju City-

By Kim, Ja-Youn
Advisor : Prof. Kim, Eui-Sik Ph.D.
Department of Architectural Engineering,
Graduate School of Chosun University


Building construction has multiple complex processes related to each other, and sometimes, it can happen that even though a careful review is conducted when calculating the construction duration, unexpected situations and certain factors affecting construction duration frequently take place to make it impossible to finish the construction on time.
When construction delay occurs, the ordering party is usually at a more advantageous position in terms of the contract than the constructing party, who is forced to come up with a feasible solution. When a construction experiences delay, the constructer usually tries to reduce the construction duration even using unreasonable and excessive work loads because the constructer has to face a serious additional cost incurrence such as paying a higher maintenance fee, higher interest rate, and additional cost for rush work in addition to the imposition of postponement fees and has to deal with the claim from subcontracting dealers. This phenomenon is a widespread problem in building construction industry.

Therefore, this study aims to propose improvement plans to efficiently manage the reduction of construction duration against any possible delays and conducted a survey investigation by visiting the construction sites of the apartment houses in Gwangju City to identify the process and construction duration management status. The study analyzed the problems and came up with possible improvement plans for reducing construction duration, and the following conclusions were reached.

First, the preliminary investigation of the construction site and understanding of the drawing must be carried out and the proper construction duration must be calculated considering the work distribution. Also, the ordering party and the constructing party must meet together and fully discuss and review the conditions of the construction site to calculate the proper construction duration.

Second, using the weekly and monthly process table, the construction progress must be checked, and using these checkpoints, the schedule must be reviewed, and the revised process table due to construction delays and the detailed process table must be written out such that the work team can easily understand them and identify the current status of the construction.

Third, through professional educational institutions and college education, professional work force must be raised, and the database must be constructed to develop an electronic operation system for reducing construction duration which can apply the exiting data to another construction site of the similar type.

Fourth, by introducing the advanced way for management, the proper way of ordering that fits the conditions in Korea must be selected, and to reduce the increase of the construction cost, it is necessary to introduce the advanced management technology that can manage the product quality, process, etc in an organic and integrated way.
Alternative Author(s)
kim, ja youn
Affiliation
조선대학교대학원
Department
일반대학원 건축공학과
Awarded Date
2008-02
Table Of Contents
목 차

ABSTRACT

Ⅰ 서 론
1.1 연구의 배경 및 목적 1
1.2 연구의 범위 및 방법 3
1.3 관련 연구의 동향 5

Ⅱ 최적공사비를 위한 공기조정(工期調整)
2.1 공기지연(工期遲延)요소 7
2.1.1 발주자 지연요인 9
2.1.2 시공자 지연요인 9
2.1.3 기타 요인 9
2.2 공기와 비용과의 관계 10
2.2.1 공기조정 10
2.2.2 공기단축과 공사비 10
2.2.3 공기연장과 공사비 13
2.3 공기 비용의 분석방법 15
2.3.1 공기단축기법 15
2.3.2 공기단축기법의 문제점 25

Ⅲ 공기단축관리 운영 실태
3.1 개요 및 일반사항 26
3.1.1 조사 개요 및 분석방법 26
3.1.2 일반사항 27
3.2 공정관리 실태 30
3.2.1 공정계획 실태 30
3.2.2 공정계획과 현장 운영상의 일치 34
3.2.3 전담인력 편성 및 교육여부 35
3.2.4 공정표 활용능력 39
3.3 공기단축관리 실태 42
3.3.1 공기지연 주요원인 및 대비 42
3.3.2 설계변경에 따른 조치 45
3.3.3 공기단축 및 공사비 산출방법 47
3.3.4 공기단축기법 인식정도 52

Ⅳ 효율적 공기단축방법의 개선방안
4.1 공정(工程)‧공기단축 계획 전략화 55
4.1.1 현장여건에 부합하는 공사기간 산정 55
4.1.2 공정표 활용능력 향상 56
4.2 공기단축관리 전문성 요구 58
4.2.1 전문인력 양성 58
4.2.2 단축관리 전산운영 59
4.3 선진관리 기술도입 60


Ⅴ 결 론 61

참 고 문 헌 62

부 록 65
Degree
Master
Publisher
조선대학교대학원
Citation
김자연. (2007). 건설공사 공기단축 방법의 개선방안에 관한 연구-광주광역시 공동주택을 중심으로.
Type
Dissertation
URI
https://oak.chosun.ac.kr/handle/2020.oak/7033
http://chosun.dcollection.net/common/orgView/200000235942
Appears in Collections:
General Graduate School > 3. Theses(Master)
Authorize & License
  • AuthorizeOpen
  • Embargo2008-02-19
Files in This Item:

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.